Home
Deck Building Deck Replacement Composite Decking Deck Repair Deck Staining Deck Railings
About FAQ Contact Call (631) 895-5795
Carpenter kneeling on fresh deck framing, marking a board before cutting

Deck Building in Smithtown, NY

New decks designed to what Smithtown's plan review asks for, dug to frost depth, flashed at the house, and built by the crew that drew them.

Why us

Built For the Ground Under Smithtown

A deck is a small structure carrying people, bolted to a house, then left out in the weather for thirty years. What decides whether it lasts is mostly buried or hidden behind the ledger board.

Holes Before Boards

Piers go to the town's thirty-six inch figure on an attached deck. The inspector sees them open, before any concrete.

A Real Plan Set

Drawings carry design loads and the wind exposure category, so plan review is not a back-and-forth of missing information.

Ledger Done Properly

Bolted in a staggered pattern, never toenailed, with metal flashing behind it. This is the connection that decides the deck.

Anchorage Fitted

Tension devices tie the deck back to the house frame so it cannot pull away sideways. Small hardware, and it is on the drawings.

Boards Gapped To The Wood

Wet treated lumber goes down near tight because it shrinks. Kiln-dried and composite do not. Getting that backwards ruins a deck.

Tape On The Frame

Self-sealing tape runs the joist tops and the ledger. The framing is the expensive half of a deck to replace later.

How a New Deck Comes Together

Four stages from the first visit to the final inspection, with the price fixed in writing before stage three.

1

Site Visit

We measure, check the grade at its lowest point, look at setbacks and work out whether concrete and lumber can physically reach the back of the property.

2

Drawings

A plan set with framing, design loads and the wind exposure category, marked prescriptive or engineered.

3

Written Price

Scope and price in writing before the permit goes in, itemised down to footing and stair count.

4

Build

Footings inspected open, then frame, flashing, decking, guards and stairs, and the final inspection.

At a glance

The Numbers a Smithtown deck is held to

What gets checkedSmithtown figure
Permit triggerAny deck over 8 inches above the lowest point of grade
Attached-deck footingsAt least 36 inches below grade (town deck guidance)
Freestanding footingsAt least 12 inches below grade (town deck guidance)
Minimum footing size14 inch round, or 12 by 12 inch square
Design frost depth3 feet
Deck live load40 pounds per square foot
Guard height36 inches where the walking surface is over 30 inches up
Guard infillNo opening lets a 4 inch sphere pass
HandrailRequired at 4 or more risers, 34 to 38 inches above the nosings
LedgerBolted in a staggered pattern, flashed, no toenails
Governing code2025 Residential Code of New York State
Deck joists set out across concrete pier blocks on a levelled lawn Carpenter kneeling on new deck framing, fitting a board into place
11787Smithtown, NY

What Does It Actually Take To Build a Deck Here?

Start at the ground. Design frost depth in Smithtown is three feet, so an attached deck's piers go at least thirty-six inches down before any framing happens, and the town looks in those holes before concrete goes in. Then the drawings, which have to carry design loads and a wind exposure category: Exposure B for wooded inland lots, Exposure C where the site is open or near the shore. Then the connection to the house, which is the part that decides whether a deck lasts thirty years or eight. Framing, ledger, flashing, guards, stairs and the finished surface all come from one crew.

  • Frost-depth pier holes
  • Loads on the drawings
  • Exposure category stated
  • Flashed, bolted ledger
  • Joist tape as standard
  • Inspections called in
Two routes

Prescriptive or engineered drawings

On the plan sheetPrescriptiveEngineered
What it meansBuilt to published span tablesSized and sealed by a design professional
SuitsRectangular decks in the ordinary size rangeLong spans, tall decks, hot tubs, odd shapes
Who signs itThe builder works to the tablesA design professional stamps the set
Plan reviewFewer questions, moves quickerMore back and forth, takes longer
Up-front costNo design feeA design fee before the first hole
On your jobThe usual answer for a back-yard deckThe answer once loads get unusual
Service Area

Deck Work Across the Town of Smithtown

Coverage runs the whole Town of Smithtown and past its edges, from Fort Salonga down to Ronkonkoma and east to Stony Brook. Kings Park, St. James and Nesconset are short runs. Prices go in writing first, and a job at the far end of the map costs what one down the road costs.

Smithtown Kings Park St. James Nesconset Commack Hauppauge Fort Salonga San Remo Nissequogue Head of the Harbor Village of the Branch East Northport Northport Stony Brook Setauket-East Setauket Centereach Lake Grove Ronkonkoma
Questions

Building a Deck in Smithtown

Pressure-treated typically runs about $28 to $52 per square foot installed in this market. The spread is real: a simple rectangle low to the ground sits at the bottom, and a raised deck with two flights of stairs, a picture-frame border and a cable rail sits at the top. Suffolk labour and three-foot footings keep the floor higher than inland markets.
Plan review times move with the season, and the Building Department quotes current turnaround when the application goes in. Submitting in winter rather than April is the single biggest thing a homeowner can do about it. We prepare the drawings and the load notes so the set does not come back for missing information.
We prepare the plan set and the design load information the town asks for, and we work with you through submission and the inspection calls. Workers' compensation proof or a filed exemption has to be in hand before the town can issue a permit at all, so that gets sorted before anything else.
Yes, if the deck is designed for it from the start. A filled tub is a large concentrated load in one spot, which usually means extra footings, heavier beams and tighter joist spacing directly underneath. That is an engineering question rather than a sales one, and it belongs on the drawings before the frame goes up.
Pressure-treated is still the most common and the cheapest to install. Capped composite has taken a large share of the second-deck market here, because the households replacing a 1980s deck usually do not want to be back on the stain cycle. Cedar and tropical hardwood sit in between.
Because the visible surface is a minority of the cost. Footing count and depth, height above grade, the number of stair flights, linear feet of railing, site access and whether anything has to be demolished first all move it more than the board choice does. A quote that does not list those is not comparable to one that does.

Start With A Drawing

Send the rough size, the height off the ground and your hamlet, and a written scope comes back with the footing and stair count spelled out.

(631) 895-5795
Monday to Saturday, 7am to 6pm
Call Now
Call (631) 895-5795